505th Engineer Light Ponton Company a 140' DS Dual Carriage Bridge over the Ruhr (Hofen)
238th Engr. C. Bn. "A"
A 140' DS Dual Carriage Bridge was pre-loaded to be built by "A" Company over the Roer. It was preloaded since it was expected to be difficult to back trailers down the approach to the site
Listing Details
Date
Status coordinate
No status yet
E-mail publisher
User
Map